Special flight permit coordination: how it works and how long it takes

A special flight permit — most people say ferry permit — lets an aircraft that does not currently meet all its airworthiness requirements, but is safe for the intended flight, fly to a place where it can be repaired, maintained, stored or delivered. In the United States it is issued under 14 CFR 21.197; in the EASA system the equivalent is a Permit to Fly.

JTech Turbines inspection team · Published November 1, 2026 · Updated November 1, 2026

When you need one

  • Ferrying an aircraft to a maintenance base after an engine change or a deferred-defect decision that falls outside the MEL.
  • Moving an aircraft out of storage for a lease delivery or redelivery.
  • Flying to a buyer's base for delivery or export.
  • Evacuating an aircraft from a hazard area.

How the FAA application works

The operator or its representative applies on FAA Form 8130-6, describing the purpose of the flight, the route, the crew, the aircraft's condition and the limitations proposed. An appropriately authorized person inspects the aircraft and states it is safe for the flight. The FAA Flight Standards office (or a Designated Airworthiness Representative, where applicable) issues the permit with operating limitations: typically crew only, specific route and weather minima, and any conditions tied to the deferred items.

What coordination actually involves

  1. Confirming what is wrong with the aircraft and why it falls outside normal dispatch.
  2. Assembling the records: maintenance status, open items, the inspection statement.
  3. Defining the flight: route, fuel stops, crew, diversion airports, overflight permissions if international.
  4. Submitting the application and answering the authority's questions quickly.
  5. Briefing the crew on the limitations and confirming the aircraft is released for the flight.
  6. For international ferries, aligning the departure and arrival authorities so the permit is valid where the aircraft lands.

How long it takes

With a complete package, days. Without one, weeks. The permit itself is often the fastest part; the delays come from missing records and an unclear statement of the aircraft's condition. Starting the paperwork when the ferry becomes likely, not when the aircraft is ready, is the whole trick.

FAQ

Can a special flight permit carry passengers?
Normally only crew essential to the flight. The permit's limitations state exactly who may be on board.
Is a ferry permit the same as a special flight permit?
Yes. Ferry permit is the everyday name for the FAA's special flight permit.
Who inspects the aircraft before the permit?
A person authorized by the FAA to determine that the aircraft is safe for the flight — typically a certificated mechanic or repair station for the inspection statement, with the authority or a DAR issuing the permit.