APU borescope inspection

Compressor, combustor and turbine of the auxiliary power unit inspected through its ports with the unit installed, findings compared with the APU maintenance manual limits, status reported serviceable or unserviceable.

Request an inspection

Inspections performed by JTech Turbines. Reports drafted in InspectView and signed by the inspector.

jruiz@jtechturbines.com·joel@jtechturbines.com·+1 (786) 340-4404·Miami, FL

Who it is for

Airlines, MROs, lessors and investors.

What is included

  • Compressor, combustor and turbine inspection through the ports.
  • Findings compared with the APU maintenance manual.

What the report contains

The inspection scope, recorded findings and the relevant manual or agreement references. Reports are drafted in InspectView and signed by the inspector.

Engines

GTCP131-9 and others — tell us the unit. State the exact model and configuration when requesting.

Where

Related guides

How to request

Complete the request below. Scheduled inspections: book about a week ahead. AOG and short notice are subject to availability.

Request an inspection

Send the engine model, ESN, airport, on/off-wing status, reason, date, report format and whether video is needed. Tell us the engine, airport and date; we confirm the nearest available inspector and a mobilization window.

Frequently asked questions

Is the inspection on wing?

Yes, with the unit installed.

How long does it take?

One to two hours after cool-down plus write-up.

What can trigger an APU inspection?

Hot starts, overtemperature, ingestion, vibration or an EGT change.