Max power assurance witnessing
An independent person present at the ground run, confirming the procedure, recording the data and comparing EGT margin and other parameters with the lease or sale minimums.
Request an inspectionInspections performed by JTech Turbines. Reports drafted in InspectView and signed by the inspector.
jruiz@jtechturbines.com·joel@jtechturbines.com·+1 (786) 340-4404·Miami, FL
Who it is for
Airlines, MROs, lessors and investors.
What is included
- Ground-run procedure confirmation.
- Recorded EGT margin and other parameters.
- Comparison with lease or sale minimums.
What the report contains
Run data, comparison with limits and any deviations.
Engines
CFM56-5B · CFM56-7B. State the exact model and configuration when requesting.
Where
Related guides
How to request
Complete the request below. Scheduled inspections: book about a week ahead. AOG and short notice are subject to availability.
Request an inspection
Send the engine model, ESN, airport, on/off-wing status, reason, date, report format and whether video is needed. Tell us the engine, airport and date; we confirm the nearest available inspector and a mobilization window.
Frequently asked questions
What is an MPA run?
A ground run at take-off power that checks EGT margin and other parameters against limits.
Can it be combined with a borescope inspection?
Yes, usually the same visit.
What is reported?
The run data, the comparison with limits and any deviations.